Atomic raises a $12.5M Series A led by Klass Capital and Madrona. Read the news
Back to Blog
CPGSupply PlanningPeople Who Plan

CPG Supply Chain: What Growing Brands Plan For

Atomic Supply TeamNovember 23, 2026

A consumer packaged goods supply chain runs from ingredients and packaging through co-manufacturers to retailers and customers' doors, and a growing brand reworks it every time it adds a retailer, a product or a country. This page collects what operators at food, beverage and consumer goods brands, and the people who invest in them, say about planning it: guests from People Who Plan, Atomic's podcast.

Each stage of growth changes the plan

Cody Berenson, SVP of Operations & Services at Siddhi Capital, a growth equity investor with its own operating team, breaks a brand's growth into stages. From pre-revenue to about $10 million in revenue there is no data, so the work is the foundation: processes, and how the brand will plan. The next stage, in market and chasing new retailers and new innovation, is in many ways harder, because the operator is building systems while the plane is taking off. Then comes a threshold:

“Once you get past the 10 to $20 million range, that's when real rigor needs to come into place. It's time to start growing up a little bit. You gotta be strategic. The mistakes you make, they're not little mistakes anymore. All of a sudden they're a hundred thousand dollar mistakes, million dollar mistakes.”

Cody Berenson, Siddhi Capital, People Who Plan Ep. 11

The product and the co-man set the limits

Manufacturing matters most, in Cody's view. A refrigerated, short-shelf-life product needs production every day or every week, and more capital. A shelf-stable product with 12 months of shelf life might run on a quarterly or bimonthly basis. Some categories have capacity at every level, from manufacturers with small MOQs to large co-mans. Others do not:

“That changes a lot when you run a product where maybe there's only two co-mans that make that product, or you need a special line that requires a hundred thousand cases for you to get on it. Those products are just more challenging.”

Cody Berenson, Siddhi Capital

His example is cottage cheese: for decades nobody built new plants for it, then demand surged and there was no capacity to be had, whatever the money or the brand's popularity.

Planning is working capital planning

"It's sales and operations planning, but it's really working capital planning too, especially in a consumer business." Brands are not getting checks the way they were five or ten years ago, Cody says. To get the next one, a brand needs to be profitable, at break-even, or on its way there. Chad Brinton saw what a buy against a missed plan does to cash. In 2019 he and a VP of finance kept missing the sales plan, assumed they would make it up the next month, and kept treating the annual sales goal as good:

“As a result, we bought way too much inventory and we actually put the business in a pretty tight spot, from a finance and cashflow perspective.”

Chad Brinton, Roger, People Who Plan Ep. 2

The business went into 2020 with what felt like mountains of inventory. When pandemic demand jumped while manufacturers were shut down, that buffer carried it through, and Chad calls it a very fortunate mistake. The part a planner controls is the first half of the story: a sales plan that keeps missing is a reason to revisit the buy before the cash is committed.

A launch date is part of the supply plan

Jesse Guzman, CEO & Co-Founder at Zucca, which builds software for CPG product development, describes a new food or beverage product as a journey of 12 to 18 months or more, highly cross-functional, with many points of failure. One change, an ingredient swap, a supplier's new price or a new regulation, runs through everything downstream. His example is removing a food dye:

“That might sound simple on the surface, but actually, when you remove a dye, you need to replace it with something. That replacement might end up changing more than just the color, but the texture or the taste. Certainly, the cost is a big piece of this. It might force you to look outside your current supply chain.”

Jesse Guzman, Zucca, People Who Plan Ep. 19

Chad, sitting in as co-host on that episode, made the planning point: when a launch date is missed, marketing needs a new story, the revenue plan no longer holds, and neither does the inventory plan. Product development cycles become the revenue forecast and the inventory forecast.

Sourcing: China Plus Two

Mike Dawson, COO at Welly Health, which makes bandages and first aid kits, says tariffs made global sourcing a central focus. China Plus One usually means a second manufacturer, often also in China. Since the tariff changes, in his view, it has become China Plus Two:

“it's not just two other manufacturers in China, it's really you need to have at least two other countries of potential source of supply identified.”

Mike Dawson, Welly Health, People Who Plan Ep. 20

China still offers the lowest cost and the best quality for the price, and suppliers elsewhere often get their raw materials there. The goal is another supplier ready to switch to at short notice.

SKUs multiply quietly

“People think of SKU proliferation as number of finished products, but a lot of people think, 'Okay, I'm gonna go sell in a unique case pack to a different customer.' And in the end, that's a unique SKU that you now have to manage and plan separately.”

Mike Dawson, Welly Health

Welly plans hundreds of components but keeps the finished goods it sells streamlined. Sean Agatep, Co-Founder at Vincero Collective, a gift brand that takes 40% of its sales in Q4, makes the same choice: "Having a lower SKU count and then also coming out with cool limited editions where you have scarcity. So doing sentimentality and scarcity together makes a more impactful brand experience."

Order less, more often

The rest of the year, outside Chinese New Year, Mike's push is to raise reorder frequency and order less inventory more often: "For somebody that's still stuck planning in Excel, like even adding one or two more reorder frequencies a year is a huge deal in terms of reducing overall average inventory." Long lead times raise the stakes on the demand side:

“When you're ordering for a four to six-month lead time, you're ordering a lot of product coverage time through that. And so you wanna make sure that what you're ordering is as accurate as it possibly can be from a demand standpoint so that you're not leaning in, 'cause a 15% fluctuation one way or the other can really take you a long time to work through.”

Mike Dawson, Welly Health

Retailers move the plan

Corey Sisson, VP Sales Strategy & Planning at SmartSweets, copies big-CPG process on purpose: "They being big CPG are good at this stuff. And so if we can do what we can to emulate their processes, then it only is gonna help us and frankly help us compete with them." Retailers still rewrite the plan, when shelf space is cut or a display is pulled back, so his answer is a supply plan tight enough to say yes when a retailer asks:

“Making sure that you're tight on opportunity and risk is just, it's the name of the game and it's not just the nice to have, it is a critical enabler.”

Corey Sisson, SmartSweets, People Who Plan Ep. 10

Where this fits in Atomic

Most of these calls are buying decisions against lead times, minimums and cash. In Atomic, that is Purchasing: what to buy, from whom, and when. Purchase orders are planned against supplier lead times, contract minimums, pack sizes and cost, with primary and backup supplier rules, and safety stock and reorder points tuned to your constraints, not a global default.

The episodes

Next Step

Ready to transform your planning?

See how Atomic can give your team planning superpowers. Schedule a personalized discovery call today.